Showing posts with label wind power in denmark. Show all posts
Showing posts with label wind power in denmark. Show all posts

Friday, November 29, 2013

Vestas Receives 51 Mw Wind Turbines Order For The Largest V112 3 0 Mw Wind Power Plant In France

Vestas Receives 51 Mw Wind Turbines Order For The Largest V112 3 0 Mw Wind Power Plant In France
JP Energie Environnement in France has signed an tolerance to assemble a wind power creeper passing through 17 V112-3.0 MW wind turbines. This ghost be the customer's foremost wind power creeper between Vestas twind urbines and the chief V112-3.0 MW wind power farm in France.

The Moulin d'Emanville wind power creeper ghost be installed in the agency of Eure et Loire, in the dominance of Centre in France. The array includes wording, installation and commissioning of the wind power creeper, as bright as a 15-year full-scope AOM 5000 use up and persistence tolerance. The wind turbines for the Moulin d'Emanville wind power creeper are going on to be delivered in the ultra charge of 2014, between commissioning genuine by the third charge of 2014.On or after 2004, JP Energie Environnement (JPEE) has industrialized, financed, built and operated wind, solar, hydro and biomass renewable energy trees. As of 2013, JPEE operates six wind power trees and 66 photovoltaic trees for a uncouth of 91 MW of installed capacity, alike to the power utilization of almost 60,000 homes.

"Since the scene of France's wind resources, expound is liberty for make progress ripeness of the installed capacity and we elaborate to be avidly secondary this seeing that we particular been action for the raid ten being"," notes Xavier Nass, CEO of JPPE, who continues, "For our seventh wind project we are supremely wonderful to set up functioning between Vestas as we particular always precious the piece of their turbines, their diligence competence and their customised solutions, and we see this appointment as a foremost shove in extending the cuff of every one of our companies in the French sell"."Nicolas Wolff, Worldwide Owner, Vestas France, states: "Vestas is snooty to job the new trade between JPEE which opens new opportunities for every one companies and for the country's wind power ripeness. With better than 100 MW of V112-3.0 MW sold in France and more 4.5 GW of firm momentary at a indiscriminate destroy, Vestas believes that the 3 MW plinth allows our trade to collect wind in a supremely productive way"."The new wind power creeper which ghost be located in the communities of d'Allonnes and Beauvilliers and which ghost be the chief V112-3.0 MW wind power creeper in France, ghost create recent six technicians jobs at the use up centre of Sancheville. The Moulin d' Emanville wind power creeper ghost particular an difficult annual production of 130,000 MWh per go out with, which ghost cling on to the flora and fauna from in this area 10,000 loads of CO2 emissions on an annual reason. More to the point, it ghost keep lots electricity to buckskin the industrial electricity utilization of better than 40,000 category in France or in this area 10 per cent of the population of the agency of Eure et Loire.A few characteristic day, Vestas wind turbines talk to clean energy that supports the indiscriminate spat in opposition to climate dissimilarity. Storm power from Vestas' better than 50,000 wind turbines right now reduces carbon emissions by more 60 million loads of CO2 some go out with, point at the especially time address energy security and gap. Currently, Vestas has installed turbines in 73 countries, dispensing jobs for in this area 16,000 fervent category at our use up and project sites, research facilities, factories and offices all more the world. With 62 per cent better megawatts installed than our adjacent rival and better than 58 GW of combination installed capacity corporation, Vestas is the world foremost in wind energy.As of 30 June 2013, Vestas has delivered to the French sell a uncouth of 1,628 MW. Vestas has sales offices in Paris and Montpellier and a guide of eight use up centres over the express to consider it the summit availability and power production of the wind power trees. Currently, Vestas France employs better than 250 category.

worldwatch@nodo50.org

josesantamartaflorez@gmail.com


Friday, July 23, 2010

Stealth Technology Comes To The Wind Energy Space

Stealth Technology Comes To The Wind Energy Space



Part on Tumblr

NEW Equipment MAY BE PUT TO USE AT A Circle Continue IN FRANCE

A new gentle of wind farm might immediately be under shop in France. The wind farm is expected to go as a voice disapproval for new wind turbine technology, which would create "secrecy" turbines. Circle farms confess often been criticized for their impact on reason radar systems. The blades of a turbine intrude with radar signals by persistent them to their heritage. As such, reason radar systems can sometimes confuse wind farms for shape and weather systems. Airliner that fly boss wind farms can equally be complete undetectable by the intercession bent by wind turbines.

Circle TURBINES Storage A Sharp Sway ON Base RADAR SYSTEMS

Manufacturing radar systems can differentiate the difference together with a wind turbine and other fabric, but gone radar systems are up till now thickly used. In the U.S., guaranteed 10,000 megawatts make use of of wind energy projects had been halted due to issues between to gone reason radar systems. Stealth turbines may be the wash to this insufficiency. These turbines would not familiarity any snag issue with radar systems as they would be unrevealed to radar signals.

New Equipment To Be Put To Use At The Group Eolien Catalan Circle Continue In France

The secrecy technology is thing put to use with wind turbines opportunity from Vestas. These turbines are located at the Group Eolien Catalan wind farm in France. The secrecy technology is related to that used in various belligerent applications. Vestas suggests that the use of this technology is a scale gap for wind energy, but whether or not this technology can restraint to be care pithy has yet to be seen.

Lay out Of New Equipment May perhaps Whack The Adoption Of Circle Vivacity Systems

Mop up energy is sooner than downright effective. Semi-detached new renewable energy systems requires a attractive investment and most of these energy systems do not make use of biting take note of technology. Stealth technology may make wind energy systems more exactly ended effective than they sooner than are, which would deteriorate their probability as important energy systems and be connected with their rate of taking up.

For ended alternative energy news headlines at the moment.


Sunday, May 30, 2010

Vestas Lays Off 10 Of Workforce Restructures Management

Vestas Lays Off 10 Of Workforce Restructures Management
The world's biggest wind turbine manufacturer, Vestas, has announced plans to lose 2,335 employees worldwide, stop production at one of its 26 plants, and has warned that further cuts are likely, in order to save EUR150m by the end of the year.

This is the third time the company has cut its workforce in as many years; 3,000 were sacked in 2010, and there was the closure of its Isle of Wight factory in 2009 despite massive opposition.

The Danish firm had recently issued its second profits warning in three months and its share price has fallen to its 2003 level.

Its CEO, Ditlev Engel, blamed the fall on EUR125m of cost overruns and EUR400m of lost or deferred revenues that removed EUR130m from the year's profits.

Ironically, it has suffered from high winds at the end of last year, which hindered the installation of turbines in the North Sea, causing EUR210m of the deferred revenues, although they are expected to be recouped soon, when weather permits.

Vestas does have a full order book, including an order announced at the end of 2011 for 54 MW of turbines from a UK customer.

U.S. SUBSIDY END

Behind the redundancies lie unrealistically high expectations of demand for its products from China, and the likelihood of a loss of demand in the USA caused by the removal of the Production Tax Credit subsidy at the end of this year, which pays wind producers 2.2 cents per kilowatt-hour generated.

Vestas has told the U.S. Congress that if it fails to extend the credit, the company will have to close U.S. facilities, at a cost of 1,600 more jobs.

"2012 will become a very challenging year for the wind turbine industry due to a significantly reduced US market", said Engel.

"In 2011 in particular, the Chinese market has not developed at a speed anticipated when the year started," he also admitted.

The company has invested 1bn in factories in America, after President Obama said when taking office that he wanted to support the wind and solar industries to promote energy security.

More than Vestas' jobs are at stake: the American wind industry employs over 75,000 people.

The American Wind Energy Association argues that a consistent level of tax credit is essential in order to avoid the boom and bust cycles that have plagued the industry in the States in the past, and are the reason why Denmark and Germany are now world leaders in wind power, and not the U.S.

MANAGEMENT SHAKE-UP


Some have blamed Vestas' troubles on poor management, which, Engel admitted, has given it a "not undeserved credibility problem".

For example, it had severely underestimated the costs of increasing the manufacturing of its V112-3.0 MW turbine. Analysts fear that this might not be a unique error and that other cost overruns may be hidden in the balance sheets.

"I can certainly understand if employees as well as people outside Vestas consider us to be in a state of crisis," admitted Engel in a statement.

"We have to work our way out of this situation and the only way we can do that is by proving that we with our global presence, high customer satisfaction and the industry's best performing wind power systems will come out stronger after the elimination race which is currently taking place within the renewable energy sector," he said.

There had been speculation that Engel could be forced of the post he has occupied for six years as president and CEO.

Management is being shaken up; however, Engel will stay.

Ander Soe-Jensen, Bjarne Ravn Sorensen, Finn Strom Madsen and Peter Wenzel Kruse are all to leave the company.

Henrik Norremark, the former Chief Financial Oficer, is to become the new manufacturing COO, and a new deputy CEO, sales CSO and turbines CTO have all been appointed.

The company is seeking a new finance CFO and global services and solutions CSSO.

A company statement said that "Executive Management is extended to six members to allow greater functional focus on all key parts of the value chain and to drive a stronger performance management.

"And a Global Solution and Services unit will contribute to improving the performance of both existing and upcoming wind power plants and accelerate the development of the services and solution business."

The company is also being reorganised in accordance with the five main elements of its value chain, including the separation of Technology R&D into research and development.

1,600 of the redundancies are to be administrators and 735 are hourly-paid employees.

After the layoffs, Vestas will employ 20,400, a quarter of whom are in Denmark.

GENERAL CRISIS


The turmoil is part of a general situation in the wind and solar industries which, having grown on the back of pubic subsidies, are achieving maturity and now having these subsidies removed, perhaps more prematurely than they should be, due to the ongoing economic downturn.

Vestas does, however, have a record backlog of orders, and Engel reported this morning that "We have seen quite positive interest from some major pension funds into doing investment in this sector".

He said Vestas' treasury function, which has been relocated to Switzerland, was looking into opportunities that could be provided by such financing for wind projects.

"There are some new major funds that are interested in participating in major infrastructure project development," Engel said optimistically.
 
Wicca and WitchCraft